- dismantling of the old roof structure, part of which had collapsed
- draining and cleaning of the fermenter
- replacement of the heating system pipes
- installation of a new belt system beneath the double membrane
- replacement of the agitator bearings
- repair of damaged sections of the double membrane
- restoration and recommissioning of the methane tank
After the successful completion of the above stages, the team at “Bio Manage” Ltd. carried out the biological start-up of the processes in the fermenter, thereby restoring its operation.